Engineer Gold Mines Ltd. (TSX-V: EAU | OTC: EGMLF | WKN: A3EEVJ) announced that crews, supplies, and equipment have arrived at its 100% owned Engineer Gold Project, located 30 kilometers southwest of Atlin in northwestern British Columbia. The immediate task is to rehabilitate the two 20-person camps at the Engineer Mine and TAG Project sites to support an expanded 2026 exploration program. Both camps are fully built but have been dormant since 2009 (TAG) and 2021 (Engineer).
The strategic advantage of having pre-existing camps cannot be overstated. President and CEO Spiro Kletas emphasized, "The fact that both camps are already in place, built and paid for, is an enormous advantage for Engineer Gold Mines and our shareholders. This will allow the Company to have full teams at both sites very shortly and will enable the Company to expedite our exploration programs." This move significantly reduces the lead time and capital expenditure typically required to establish field operations, allowing the company to focus resources directly on drilling and other exploration activities.
The Engineer Gold Project encompasses approximately 18,319 hectares and is subdivided into three principal target areas: the historic Engineer Gold Mine, the TAG Property, and the Wann River prospect. The Engineer Gold Mine is a past-producing underground gold-silver operation with historical production between 1910 and 1952 totaling approximately 14,263 tonnes grading 39.4 g/t gold and 19.5 g/t silver (BC Minfile 104M014). A historical Inferred Mineral Resource completed in 2011 (Snowden, amended 2018) estimated 25,000 ounces of gold at a grade of 19 g/t, based on a 5.0 g/t gold cut-off, which demonstrates the property's significant mineral potential.
The TAG Property, located about 6 kilometers north of the Engineer Mine, is associated with a 6-kilometer-long structurally controlled mineralized system. Historical drilling has returned notable intervals, including 1.7 g/t Au over 26.7 meters in hole TAG06-23 and 1.3 g/t Au over 35.0 meters in hole TAG07-29. These results underscore the area's exploration upside.
The Wann River prospect, 4 kilometers south of the Engineer Mine, represents a highly prospective orogenic gold target. A quartz grab sample returned 263 g/t gold and 1,350 g/t silver from the Lum showing, and drilling in 2011 intersected 11.3 g/t Au over 1 meter in two holes. The company is keen to advance these targets with the newly mobilized crews.
By reactivating the camps, Engineer Gold Mines is positioning itself to accelerate its exploration efforts, which is crucial for unlocking the full potential of its British Columbia assets. The company's focus on efficiency and cost management is expected to benefit shareholders as it moves forward with its 2026 programs.


